Details revealed behind OliverMcMillan's newest Hawaii mixed-use tower
OliverMcMillan/Queen Emma Waikiki
Apartment Project
·
· -Needs Waikiki Special District Permit, Planned
Development Apt. Permit
·
-Possible name: “OM Kuhio @ Waikiki
· -
Site zoning: Apartment/Mixed Use
·
-65 year ground lease to start in 18 months
· -20%, or 100 units of the 500 total apartment
units to be “affordable” at 80% AMI
·
-2.52 total acres of land involved (Food Pantry
site, old Perry Smorgy’s site, 3 small walk-up apts (Waikiki Regents, Beachside
1 & 2, Queen Emma Apts).
·
-Project sites borders Walina St., Kuhio Ave. and
Kanekapolei St.
·
-The 3 small walk-up apts (total 54 units) will
be renovated and comprise of half of the affordable housing in the new project
·
-27-story tower on Food Pantry/old Perry Smorgy’s
site to include studios (350 sf), 1bd, 2bd, 3bd (1,100-1,200 sf)
·
-Sample affordable rents: $1,466/mo. (studio),
$1,570 (1 bd.)
·
-To include rooftop amenity deck (gym, pool,
BBQs, Sky Social Lounge)
·
-Developer is 6 months into the project
·
-2 years to do outreach/design/entitlements
·
-Summer 2019 to start 65 year ground lease with
Queen Emma
·
-Construction to take 2 years, possibly open by
2021
·
-OM will manage the apartments
·
-This is OM’s first apartment rental project in
Hawaii; they specialize in multi-family on the Mainland
·
-Not using any govt. subsidies for the project
·
-To include 40,0000 sf of retail along Kuhio Ave.
(2 floors)
·
-2nd floor of retail will be a
neighborhood grocery store
·
-1st floor will be neighborhood retail
– not luxury (coffee, ice cream, pharmacy)
·
-Will have units in the podium as well as parking
·
-1 level of parking is designed to redeveloped
into unit spaces in the future
·
-Will preserve large banyan tree on the property
·
-Hasn’t hired general contractor yet
·
-Website: OMKuhio.com (not much there right now)
Comments
Post a Comment